World Library  
Flag as Inappropriate
Email this Article

Mars Surveyor 2001 Lander

Article Id: WHEBN0000458206
Reproduction Date:

Title: Mars Surveyor 2001 Lander  
Author: World Heritage Encyclopedia
Language: English
Subject: Phoenix (spacecraft), 2001 Mars Odyssey, Libya Montes, Peter Smith (scientist), Mars-Aster
Collection: Cancelled Spacecraft, Missions to Mars, NASA Space Probes
Publisher: World Heritage Encyclopedia
Publication
Date:
 

Mars Surveyor 2001 Lander

Artist's conception of the Mars 2001 Surveyor Lander Spacecraft, with an inset showing details of the MIP experiment. Image courtesy of NASA Glenn Research Center

The NASA Mars Surveyor 2001 Lander was a planned Mars probe which was canceled in May 2000 in the wake of the failures of the Mars Climate Orbiter and Mars Polar Lander missions in late 1999. The Lander was a component of the Mars Surveyor 2001 project, and its companion spacecraft Mars Surveyor 2001 Orbiter, renamed 2001 Mars Odyssey, was launched and went into orbit about Mars on October 24, 2001.

The 2001 Surveyor lander spacecraft was built under contract to NASA by the Lockheed Martin corporation. The basic lander design is identical to that of the Mars Polar Lander, which had been intended to be the first of a series of low-cost "Mars Surveyor" landers sent to Mars. Prior to mission cancellation, cost overruns and technical problems caused the Lander design to be rescoped, and the planned large Athena rover was replaced by a small rover duplicating the Sojourner which was a part of the Mars Pathfinder mission. The Athena did later make it to Mars, however, with two such rovers making up the Mars Exploration Rover Mission of 2004. The second of these, MER-B Opportunity, landed at Mars Surveyor 2001 Lander's target site, Meridiani Planum.

The 2001 Surveyor lander was also intended to carry to Mars a test payload, MIP (Mars ISPP Precursor), that was to demonstrate manufacture of oxygen from the atmosphere of Mars,[2] as well as test solar cell technologies and methods of mitigating the effect of Martian dust on the power systems.[3]

The Mars Surveyor 2001 Lander itself was kept in storage and then used as the lander on the Phoenix mission; it is currently on Mars in the north polar region. The Phoenix lander has on board three instruments that were originally built for the Mars Surveyor 2001 Lander:

References

External links

  • NSSDC Master Catalog entry
  • Workshop on Mars 2001: Integrated Science in Preparation for Sample Return and Human Exploration (papers describing mission and experiments) (11 M pdf)
  • MIP Experiment summary, presented at Lunar and Planetary Science XXX, Houston, TX (1999).

This article was sourced from Creative Commons Attribution-ShareAlike License; additional terms may apply. World Heritage Encyclopedia content is assembled from numerous content providers, Open Access Publishing, and in compliance with The Fair Access to Science and Technology Research Act (FASTR), Wikimedia Foundation, Inc., Public Library of Science, The Encyclopedia of Life, Open Book Publishers (OBP), PubMed, U.S. National Library of Medicine, National Center for Biotechnology Information, U.S. National Library of Medicine, National Institutes of Health (NIH), U.S. Department of Health & Human Services, and USA.gov, which sources content from all federal, state, local, tribal, and territorial government publication portals (.gov, .mil, .edu). Funding for USA.gov and content contributors is made possible from the U.S. Congress, E-Government Act of 2002.
 
Crowd sourced content that is contributed to World Heritage Encyclopedia is peer reviewed and edited by our editorial staff to ensure quality scholarly research articles.
 
By using this site, you agree to the Terms of Use and Privacy Policy. World Heritage Encyclopedia™ is a registered trademark of the World Public Library Association, a non-profit organization.
 



Copyright © World Library Foundation. All rights reserved. eBooks from Hawaii eBook Library are sponsored by the World Library Foundation,
a 501c(4) Member's Support Non-Profit Organization, and is NOT affiliated with any governmental agency or department.